FP McCann Panel System MPS

FP McCann
PT/433/0119

Scope

To assess the FP McCann Panel System MPS which is a modular pre-cast concrete system for the construction of buried and above ground chambers and tanks for the waste water industry.

The approval scope does not extend to performance of the structure application

Description

The FP McCann Panel System is a modular constructed chamber that can be designed for a range of applications such as; water treatment, CSO, storage tanks, large size manholes, pumping stations, valves, chambers, etc.

The system consists of a range of factory cast concrete units that are delivered to site and the structure assembled on-site with an insitu RC cast base.

Full details can be found in the Assessment Schedule opposite.

Approval period

31st January 2019 - 31st January 2024

Click on certificate to enlarge

View Assessment Schedule.

Latest News